Semi-automatic kozinaki line

We offer a new minimum line designed for the production of kozinaki from seeds, nuts and dried fruits with binding syrup. For complete readiness, they can undergo dehydration, UV drying or conventional drying baking in the oven. Line productivity: 50-100 kg/hour. The minimum thickness of such gozinaki is from 3 mm. By adjusting the speed, you change the capacity, but due to the different formulation, each product may have different technological optimal formation rate! There is a flowpack at the end of the line, but you can also use simple thermal sealer to pack.
€28,800.00

We offer a new minimum line designed for the production of kozinaki from seeds, nuts and dried fruits with binding syrup. For complete readiness, they can undergo dehydration, UV drying or conventional drying baking in the oven. Line productivity: 50-100 kg/hour. The minimum thickness of such gozinaki is from 3 mm. By adjusting the speed, you change the capacity, but due to the different formulation, each product may have different technological optimal formation rate! There is a flowpack at the end of the line, but you can also use simple thermal sealer to pack.

Standard packaging - flowpack, tiles. If you need another simpler and cheaper packer, you can replace it with a clipper, twistator, thermal sealer or eliminate it altogether.

Line composition:
1. Electric kettle for boiling syrup and mixing components, 100 kg - 1 piece x $7.500,00
2.Accessories: bath + ice rink - 2 pcs. = EUR 500,00
3. Steel forming table with cutting - 1 pc. $7.000,00
4.Cooler under the table - 1 piece x 5.800,00 EUR
5.Flowpack - 1 pc. $8.000,00
 
Guarantee:

The manufacturer undertakes to repair or replace all defective parts within 12 months from the launch date equipment, excluding electrical, electronic and parts subject to normal wear and tear. Equipment void of warranty if used inappropriately. In case of repair or replacement, all costs for transport, accommodation of the manufacturer's equipment/s are paid by the buyer. Mounting optional, not included price. Shipping time is approximately 60 days.

Note: the price does not include packaging from Italy, by air - 800 EUR, on a pallet in a wooden box by sea - 1.300 EUR
 
Manufacturer: Italy, Türkiye, China

Price ex factory line: 28.800,00 EUR